FUEL TANK CONSTRUCTION AT CIGLI MAIN JET BASE

Project tıtle: FUEL TANK CONSTRUCTION AT CIGLI MAIN JET BASE

Locatıon: CIGLI MAIN JET BASE/İZMIR

Clıent/Owner: MSB.INŞ.EML. VE NATO GUV.YAT.D.BŞK.LIĞI/RESTAŞ AŞ

Start Date: 13 AUGUST 2010

Completıon Date: 06 DECEMBER 2011

Under the scope of the project following activities has been completed

1- Construction of  semi buried concrete 1250m3 JP-8 fuel tank

2- Valve excavation construction with sliding concrete cover

3- Field drainage excavation (5meter in depth) construction and all related  drainage canals construction in of the base.

4- Production of PN 16 DN150 (546m) and PN 16 DN 50 (103m) field pipe construction and X-ray and air tests of the pipes.

5- 1 piece of complete level measurement device and 1 piece of sample gathering apparatus production

6- 2 piece of PN 16DN 150 dry and 1 pece liquid system fire holder supply and installation

7- For the pump building which is constructed upper side of the tank ex-proof distribution panel and related installment are successfully completed by the technical team of Restaş.

8- Supply and installation of 2 piece fuel transfer  pomp-motor group  with the capacity 120m3/h

9- Restoration of manifold station drainage and the mechanic system

10- Restoration of automatic control panel and low voltage panel

11- Demolishing old concrete pavements of Çiğli Main Jet base and constructing the new concrete pavement

12- Construction of raft foundation with performing soil improvements-making rockfill using 0-500kg stones and lower base material-

13- Concrete walking road constructions are completed through and around the fuel tank constructed by Restaş.