Project tıtle: FUEL TANK CONSTRUCTION AT CIGLI MAIN JET BASE
Locatıon: CIGLI MAIN JET BASE/İZMIR
Clıent/Owner: MSB.INŞ.EML. VE NATO GUV.YAT.D.BŞK.LIĞI/RESTAŞ AŞ
Start Date: 13 AUGUST 2010
Completıon Date: 06 DECEMBER 2011
Under the scope of the project following activities has been completed
1- Construction of semi buried concrete 1250m3 JP-8 fuel tank
2- Valve excavation construction with sliding concrete cover
3- Field drainage excavation (5meter in depth) construction and all related drainage canals construction in of the base.
4- Production of PN 16 DN150 (546m) and PN 16 DN 50 (103m) field pipe construction and X-ray and air tests of the pipes.
5- 1 piece of complete level measurement device and 1 piece of sample gathering apparatus production
6- 2 piece of PN 16DN 150 dry and 1 pece liquid system fire holder supply and installation
7- For the pump building which is constructed upper side of the tank ex-proof distribution panel and related installment are successfully completed by the technical team of Restaş.
8- Supply and installation of 2 piece fuel transfer pomp-motor group with the capacity 120m3/h
9- Restoration of manifold station drainage and the mechanic system
10- Restoration of automatic control panel and low voltage panel
11- Demolishing old concrete pavements of Çiğli Main Jet base and constructing the new concrete pavement
12- Construction of raft foundation with performing soil improvements-making rockfill using 0-500kg stones and lower base material-
13- Concrete walking road constructions are completed through and around the fuel tank constructed by Restaş.